أعلى تشغيل رافعة الجسر

أعلى تشغيل رافعة الجسر

بريد إلكتروني: [email protected]
الجوال و سكايب و واتساب: + 86 182 3712 0067

  • الحمولة: 1 طن ~ 500 طن
  • فترة الرافعة: 4.5 م ~ 31.5 م أو حسب الطلب
  • ارتفاع الرفع: 3 م ~ 30 م أو حسب الطلب
  • وحدة الرفع: رافعة حبل سلكي أو رافعة سلسلة
  • واجب العمل: A3~A7
  • مصدر الطاقة: يعتمد على مصدر الطاقة الخاص بك

ملخص

Top running bridge crane is composed of box type bridge frame, lifting trolley, crane traveling mechanism, and electrical system. It is an excellent choice where high speeds and heavy service are required. It is widely used in warehouses, freight yard and other department. And it is prohibited to use the equipment in the combustible, explosive or corrosives environment.

Top running bridge crane relys on the bridge frame along the workshop orbital direction moving longitudinal, the trolley along the main beam direction moving transverse and the hook lifting movement to work. High lifting capacity of this crane is designed with two hooks that means two independent sets of hoisting mechanism. The main hook is used to lift heavy objects while the auxiliary used to lift light objects,the auxiliary can also be used for collaborative main hook tilting or tipping the material.

ميزة وميزة

  • Modular design complying with FEM/DIN standard.
  • CNC cutting for complete web plate and Euro system profile maingirder.
  • Three-in-one motor and rope drum arranged in U-shape makes for compact dimensions.
  • Largely maintenance-free, low wear, long service life.
  • Safety components allows to high reliability, high security.
  • Smooth starting and braking,intelligentialize.

Safety precautions

  • Upward and downward limit switch for hook
  • Low-voltage protection function
  • Phase sequence protection function
  • Overload protection
  • Emergency stop protection
  • Hook with latch
  • حواجز مطاطية

What should pay attention to?

  • To ensure the safety of the equipment and operator, during the period of using, the instructions along with the productions should be observed.
  • Make sure the load that will be lifted is in crane’s safe load range. Never exceed the prescriptive maximum load capacity.
  • Horizontal movement must also begin slowly to prevent the load from swinging or coming into contact with other obstacles.
  • After a period of working, the crane and its components should be inspected. The time interval between the inspections depends on the practical usage.

بريد إلكتروني: [email protected]
الجوال و سكايب و واتساب: + 86 182 3712 0067

للإستفسار يرجى إرسال البريد الإلكتروني: [email protected]

منتجات ذات صله