top-running-bridge-crane

Κορυφαίος γερανός γέφυρας

ΗΛΕΚΤΡΟΝΙΚΗ ΔΙΕΥΘΥΝΣΗ: [email protected]
Κινητό & Skype & WhatsApp: + 86 182 3712 0067

  • Ικανότητα φόρτωσης: 1 τόνος~ 500 τόνοι
  • Άνοιγμα γερανού: 4,5 m~ 31,5 m ή προσαρμοσμένο
  • Ύψος ανύψωσης: 3m~ 30m ή προσαρμοσμένο
  • Μονάδα ανύψωσης: συρματόσχοινο ανυψωτικό ή ανυψωτικό αλυσίδας
  • Καθήκον εργασίας: A3~A7
  • Πηγή ρεύματος: με βάση το τροφοδοτικό σας

ΣΦΑΙΡΙΚΗ ΕΙΚΟΝΑ

Top running bridge crane is composed of box type bridge frame, lifting trolley, crane traveling mechanism, and electrical system. It is an excellent choice where high speeds and heavy service are required. It is widely used in warehouses, freight yard and other department. And it is prohibited to use the equipment in the combustible, explosive or corrosives environment.

Top running bridge crane relys on the bridge frame along the workshop orbital direction moving longitudinal, the trolley along the main beam direction moving transverse and the hook lifting movement to work. High lifting capacity of this crane is designed with two hooks that means two independent sets of hoisting mechanism. The main hook is used to lift heavy objects while the auxiliary used to lift light objects,the auxiliary can also be used for collaborative main hook tilting or tipping the material.

Χαρακτηριστικό & Πλεονέκτημα

  • Modular design complying with FEM/DIN standard.
  • CNC cutting for complete web plate and Euro system profile maingirder.
  • Three-in-one motor and rope drum arranged in U-shape makes for compact dimensions.
  • Largely maintenance-free, low wear, long service life.
  • Safety components allows to high reliability, high security.
  • Smooth starting and braking,intelligentialize.

Safety precautions

  • Upward and downward limit switch for hook
  • Low-voltage protection function
  • Phase sequence protection function
  • Προστασία υπερφόρτωσης
  • Emergency stop protection
  • Hook with latch
  • Προσκρουστήρες από καουτσούκ

What should pay attention to?

  • To ensure the safety of the equipment and operator, during the period of using, the instructions along with the productions should be observed.
  • Make sure the load that will be lifted is in crane’s safe load range. Never exceed the prescriptive maximum load capacity.
  • Horizontal movement must also begin slowly to prevent the load from swinging or coming into contact with other obstacles.
  • After a period of working, the crane and its components should be inspected. The time interval between the inspections depends on the practical usage.

ΗΛΕΚΤΡΟΝΙΚΗ ΔΙΕΥΘΥΝΣΗ: [email protected]
Κινητό & Skype & WhatsApp: + 86 182 3712 0067

Για πληροφορίες, στείλτε email: [email protected]

Σχετικά προϊόντα