On April 11, 2025, SEVENCRANE received an order from a repeat customer from Pakistan. This order relates to two 3-ton SNHS European overhead cranes to be installed in the customer's factory. Much care must be taken into account regarding the configuration of the factory space, especially the installation space and the runway structures dimensions.
Both cranes will be delivered with remote control, matching rails, and a power supply conductor rail. Additionally, the customer provided the factory drawings to enable us to verify the dimensions of the cranes to be produced.
European Overhead Crane Design According to Factory Drawings
The order involves two SNHS European overhead cranes that have different spans. The referenced specifications in this order include a 3-ton load capacity, 36-meter span, and 14.021 meters of lifting height. The dimensions of the cranes will be verified according to the customer's factory drawings.
The cranes will operate on a 400V power supply and use remote control. Both are specified for A5 duty classification with an IP55 protection rating. These requirements form the basis of the equipment configuration.
When selecting a European overhead crane, building conditions matter just as much as lifting capacity. In this project, the distance from the top of the runway beam to the lowest point of the factory structure is 3,004 mm. This measurement is important because the available headroom affects how the crane can be installed and how much usable lifting height can be achieved.

Adapting the Main Girder for the New Order
One particular detail makes this project different from a standard order. The main girder is to be modified from the girder supplied under Order 1173. This requires the existing structure to be adapted to the requirements of the new installation.
Using an existing main girder calls for careful engineering checks. Its dimensions and structural condition must be suitable for the new configuration, and the modified design must meet the required load and installation specifications. The customer's factory drawings will help guide this work.
For SEVENCRANE, the goal is to make the existing component fit the new project without compromising the required performance. Reusing a main girder can also be a practical option when the structure is suitable and the necessary modifications are properly verified.
Rails and Power Supply Included
The supply includes 60 × 40 mm rails, with four 79-meter rail lengths specified in the order. A 16 mm² conductor rail system is also included, with two 79-meter lengths. The conductor rail is intended for this crane installation rather than a shared system.
Supplying the rails and power supply components together helps the customer coordinate the installation. These details are easy to overlook when focusing only on the crane itself, yet they are essential to preparing the equipment for use.
The standard accessories and configuration will be supplied according to the confirmed requirements.

Delivery Plan for the Pakistan Project
The order has a production lead time of 25 working days. The agreed trade term is EXW, and the customer will arrange transportation through its designated logistics provider. Payment will be made by T/T under the agreed terms.
As a returning customer, the buyer already has experience working with SEVENCRANE. This project continues that relationship, with particular attention to the factory layout, the modified main girder, and the supporting installation components.
A well-planned European overhead crane project starts with accurate measurements and clear communication. By checking the drawings and confirming the technical details before production, SEVENCRANE aims to supply equipment that fits the customer's factory requirements.