The necessity of daily maintenance of 10 ton eot crane

Oct 12, 2021

The 10 ton eot crane is a lifting equipment that is horizontally framed over the workshop, warehouse and material yard for lifting and transporting materials.

Electric hoist trolley cost

Eot crane is installed on the crane beams on both sides of the height of the plant. And the whole equipment can run horizontally on the tracks laid on the crane beam. The hook and the electric hoist are used for lifting motion to complete the lifting and moving of heavy objects.

The load-bearing components include main beams, end beams, outriggers and gourd trolley frames. The main beam is the main load-bearing component of the hoist. And it also directly hangs the electric hoist as its running track. It not only supports the load, but also directly affects the operating performance of the electric hoist.

installation photo of crane

The prerequisite and basis for the use of mechanical equipment is the daily maintenance and maintenance of the equipment. 10 ton eot crane is no exception.

The daily maintenance of the eot crane is to check the crane, clean the components, replace the wearing parts, and add and replace the lubricating oil when the crane is not malfunctioning to ensure the daily activities of normal work.

Anti-sway Technology

During the long-term use of the 10 ton eot crane in different environments (including harsh environments), the mechanical parts are worn, the gap increases, and the fit changes, which directly affect the original balance of the equipment. The stability, reliability, and use efficiency of the equipment will be reduced to a considerable extent. And even cause the mechanical equipment to lose its inherent basic performance and fail to operate normally.

Seeking the most economical equipment life cycle costs, the pursuit of accident-free, high efficiency, this is the ultimate goal of bridge crane maintenance.